Saturday, 2 November 2013

RISK ASSESSMENT

Health & Safety: Risk Assessment.
 
 
To make sure that all cast and crew are safe, I decided to take a risk assessment. To do this I made a list of all the possible hazards and risks in all of my locations and decide what can be done to prevent them.
The locations I assessed was;
  • River
  • Kitchen(s)

No comments:

Post a Comment